Site guide
Prepare the site while the home is being built and shipped.
Good site preparation protects the home, reduces arrival-day delays and prevents expensive equipment from waiting while basic work is unfinished. Exact requirements must be designed for the property and approved locally.
Feasibility and approvals
- Confirm permitted use, setbacks, height and density
- Identify building, utility and environmental approvals
- Obtain a boundary and topographic survey where required
- Review flood, wind, seismic, frost, snow and wildfire conditions
- Engage locally licensed design and engineering professionals
Ground and foundation
- Complete soil or geotechnical review appropriate to the project
- Clear, grade and compact the work area
- Design drainage away from the home and foundation
- Construct the engineered slab, piers or support system
- Confirm anchor positions, tolerances and finished elevation before delivery
Utilities
- Bring electrical service to the approved connection point
- Confirm potable-water pressure and connection
- Complete sewer, septic or wastewater provisions
- Plan air-conditioning condensate and stormwater drainage
- Protect below-grade services from delivery and lifting equipment
Access and equipment
- Measure road width, corners, gates and overhead clearance
- Confirm bridge, pavement and ground load capacity
- Reserve the unloading and crane or forklift position
- Create a weather-appropriate temporary access surface
- Prepare a lift or assembly plan with the responsible contractor
Before the vessel arrives
Reconfirm the shipping schedule, customs broker, inland carrier, lifting provider and site crew. Photograph completed foundations and access. Delays at this stage can create port storage, equipment standby and rescheduling costs.
Compare real models